COMANCO


COMANCO Gets Started at ACMS Class I Landfill

The COMANCO team kicked-off construction in a new 30 acre landfill in Sumterville, FL on Monday, 5/21/12.  The landfill cell portion of work consists of installing a 5 layer geosynthetic liner system for two subcells.  This system will be deployed onto a prepared sub-grade in the following sequence:

1)      geosynthetic clay liner (GCL)

2)      secondary 60-mil HDPE geomembrane

3)      secondary geocomposite

4)      primary 60-mil HDPE geomembrane

5)      primary geocomposite

This will all be covered with 2’ of protective cover soil with the non-active portion being covered by a 20-mil HDPE white rain tarp when complete.  The two subcells will each contain a leachate collection trench consisting of HDPE pipe wrapped in quartz gravel and geotextile. 

Additional items in COMANCO’s scope of work are:

-          Constructing two leachate removal sump, piping and concrete pad areas,

-          Running approximately 2,900 LF of 6” HDPE leachate forcemain,

-          Building a leachate storage and truck loading area,

-          Supplying and installing six new 44,000-gallon FRP leachate storage tanks.

COMANCO is contracted with ACMS, Inc. to perform this work and the project is scheduled to finish in late 2012.  Below are photos of the beginning phases of GCL and geomembrane deployment. 

Posted from Sumterville, FL
Posted by email 

Comments [0]


New Landfill Cell Expansion Completed - Arizona

COMANCO completed the installation of a new landfill cell in Buckeye, AZ. COMANCO installed 384,417 SF of 60 Mil HDPE Textured Geomembrane and 355,496 SF of Bentoliner Geosynthetic Clay Liner. There was also 3,039 LF of extrusion welding done onsite.

Project was completed safely and on schedule.


Polk County North Central Landfill Phase III Gas System - Update

The COMANCO crew has been working hard on the Polk County Landfill Phase III Gas System and has now finished all 8 of the horizontal gas collectors on the North Cell of the project. The crew installed approximately 5,000 linear feet of solid and perforated 6” HDPE pipe and covered it with gravel, geotextile, and soil fill. The crew is now working on the 18” header and 2” forcemain/air supply lines that will eventually connect the collector pipes into the blower/flare system (to be installed next month).

The crew recently was rewarded with a safety lunch buffet for zero lost-time incidents on the project so far. The lunch was attended by the entire crew along with the management team and a representative each from safety, human resources, and Jones Edmunds and Associates.

Below are some progress photos.

Posted by nickbridges 

Comments [0]


Progress at West Nassau Landfill

The COMANCO team is nearing the end at the West Nassau Landfill Closure project in Callahan, FL.  Topsoil and sod has begun to go down on top of the liner “cap” system and protective cover. The two GFFR (grout filled fabric revetments) downslope stormwater channels have been installed as well.  Below are photos showing the team’s efforts. 

Posted from Callahan, FL
Posted by email 

Comments [0]


Leach Pad Completion Virginia City, Nevada

COMANCO completed the installation of a new leach pad for a mine in Virginia City, Nevada. We installed 305,166 SF of 80 Mil HDPE Single Sided Microspike Geomembrane and 305,284 SF of Bentomat DN Geosynthetic Clay Liner.

Project was completed ahead of schedule and under budget.

Project was completed using multiple crews and different times with no incidents.

Great Job Team.


Oneok Brine Pond Reline

COMANCO completed a brine pond reline for a natural gas fractioning site. We installed 147,678 SF of 60 Mil HDPE Textured Geomembrane, 68,050 SF of 60 Mil HDPE Smooth Geomembrane, 147,678 SF of 40 Mil HDPE Textured Geomembrane, 68,050 SF of 40 Mil HDPE Smooth Geomembrane & 4,725 SF of 100 Mil HDPE Smooth Geomembrane. We also installed 215,728 SF of 200 Mil HDPE Bi-Planer Geonet.

Great Job Team.

Regards,

Scott N. Harker | Project Manager

COMANCO Environmental Corporation